Form dwarf walls or piers to support GRC floor panels |
2 |
Place GRC filter panels into position |
|
|
3 |
Level with laser to within 3mm using stainless steel shims. Seal panel joints with mastic or grout. |
4 |
Tie reinforcing steels onto starter bars to form a total structure with the base floor |
|
|
5 |
Remove small bush protection caps and screw in polypropylene filter sleeves |
6 |
Snap in disposable sealing caps to protect filter sleeve threads against the ingress of concrete |
|
|
7 |
Pour and vibrate concrete until level with plastic caps |
8 |
Remove protective plastic caps and screw in filter nozzles. Level to 2mm using plastic or stainless steel shims |
|
|
9 |
Carry out air distribution test
|
|
|
|