admin

Road and Rail Bridge Permanent Formwork

Oxford Road, Manchester

Time had taken its toll on the terracotta corbel blocks above the windows at the base of Manchester’s…

St. Georges Mews

Building an arch in the busy centre of London is never likely to be easy. Unless you use…

BCM working with Jaguar Cars

For 5 years, BCM worked in conjunction with Jaguar Cars on the production of entrance statements for 35…

Healthmatic

Currently working with Healthmatic on the production of stand alone toilet buildings, BCM are producing GRC stud frame panels and…

Composting Toilets

Probably not what you first think of when you consider GRC, or BCM GRC, but we are proud…

Peterborough to Doncaster GNGE

Contractor: Carillion Multiple phase project approx quantity 12,000 lin m The contractor is achieving an average of 90…

Kings Cross Hotel London

Main Contractor: Wallis Sub Contractor: Troika Ltd This project is part of the Kings Cross Station Redevelopment and…

Sainsbury’s Penrith

Contractor: Bowmer & Kirkland Installer: Mansell Finishes The GRC was chosen as an alternative to natural stone for…

Harrogate Signalling Renewal

Contractor: Amey Rail 6400 lin m of troughing and stakes supplied with 60 lin m + of channel…