Between 2009 and 2011 BCM GRC Ltd worked alongside senior Network Rail personnel to comprehensively upgrade our elevated systems overcoming issues that have been affecting E&P and S&T for a number of years.
Issues such as finger trapping, lid “popping” and troughs dropping between posts were all discussed and dealt with, and this extensive upgrade has seen the BCM GRC Ltd system gain widespread acceptance by those who have used it ever since.
In addition to offering a product that is easily installed and maintained, GRC is a material which has distinct advantages over other materials.
All these benefits make GRC a quality product
BCM GRC Ltd are now a Tier 1 supplier to Network Rail under Agreement No: 5847/01/386