More sustainable and versatile than conventional concrete, GRC is emerging as a material for the future, but it has been around for years – and our GRC may be closer than you think! As the most experienced GRC manufacturer in the UK, we’ve supplied projects all over the country, with our GRC adorning eye-catching facades in almost every major British city. Take a look at the interactive map to see just some of the notable projects that BCM have supplied over the years. If you’d like to know if we’ve supplied any projects near you, or if you have an enquiry and would like us to accompany you to look at one of our installed projects, please get in touch.

Main map

Sohmen Concert Hall

  • Approximate GRC Area: 600m2
  • Project timescales: 2024
  • Location: Oxford

In October 2025, a new 500-seat auditorium at Oxford University will open as the Sohmen Concert Hall. In 2024, BCM GRC supplied the prestigious project with acoustic wall panels that line the auditorium, in addition to the bullnose soffit panels beneath the gantry.

Alexander Stadium

  • Approximate GRC Area: 1031m2
  • Project timescales: 2021-22
  • Location: Birmingham

Alexander Stadium in Birmingham underwent significant redevelopment in 2021, ahead of staging the Commonwealth Games in the summer of 2022.

BCM GRC supplied GRC to the internal and external areas of the new main stand, including the debossed lettered panels on the stand’s exterior which display the stadium’s name.

University of Strathclyde

  • Approximate GRC Area: 500m2
  • Project timescales: 2014
  • Location: Glasgow

BCM GRC supplied the column encasements that clad the University of Strathclyde’s Technology and Innovation Centre, a triangular-shaped, state-of-the-art research facility which sits at the heart of Glasgow’s City Centre.

The building was officially opened by Queen Elizabeth II in July 2015.

No. 1 Spinningfields

  • Approximate GRC Area: 500m2
  • Project timescales: 2003
  • Location: Manchester

The encasements of the V-shaped, circular columns that surround the ground floor of this large office building in Manchester’s City Centre were supplied by BCM GRC in 2003… but have stood the test of time and still look great today.

New Square Shopping Centre

  • Approximate GRC Area: 1250m2
  • Project timescales: 2013
  • Location: West Bromwich

New Square Shopping Centre in West Bromwich, England, opened in July 2013 as a 473,000 square feet shopping and leisure venue.
BCM GRC supplied column cladding and panels to surround the shop entrances.

Sainsbury’s, Penrith

  • Approximate GRC Area: 500m2
  • Project timescales: 2011
  • Location: Penrith

The Sainsbury’s superstore in Penrith is topped by a GRC Feature Cornice, made by BCM, who also supplied the building’s band course & copings.

All GRC elements of the building were cast in a sandstone colour that matched the stone used to clad columns on the store’s main entrance.

Church Inn

  • Approximate GRC Area: 705m2
  • Project timescales: 2022
  • Location: Manchester

In 2022, BCM supplied grey GRC cladding to ‘The Church Inn’ in Manchester, a project which converted the vacant site of a former pub into much-needed student accommodation.
The jewel in Church Inn’s architectural crown is the large, debossed lettering at the top of each of the building’s four elevations, which – nine stories high – creates a landmark visible across the MMU campus and from The University of Manchester.

The GRC we supplied to Church Inn was expertly installed by our partner installer, Henley Stone.

MET Quarter

  • Approximate GRC Area: 165m2
  • Project timescales: 2018
  • Location: Liverpool

The MET Quarter shopping centre in Liverpool underwent refurbishment in 2018, with an ambitious target programme for completion in order for the shopping centre to reopen in time for the peak Christmas season.

BCM were immensely proud of the eye-catching GRC we delivered on time for this project, despite the tight deadlines.

Charterhouse School

  • Approximate GRC Area: 225m2
  • Project timescales: 2019
  • Location: Surrey

A project that was “expertly designed, detailed, and executed”, in 2019, BCM GRC Ltd supplied the striking GRC fascias to the new Science and Maths Centre at Charterhouse School in Godalming, Surrey.

The project, conceived by Design-Engine Architects, went on to win a Civic Trust Award at the annual event in 2020.

Romford Rail Operating Centre

  • Approximate GRC Area: 1750m2
  • Project timescales: 2014
  • Location: Romford

The Rail Operating Centre in Romford was one of 12 new facilities that replaced the existing operating sites controlling the entire UK rail network, and BCM supplied the large grey panels which give the facade of the building its modern, yet unassuming look, fitting the design brief.

BCM also supplied Network Rail’s identical Rail Operating Centres in Manchester and Three Bridges, Crawley.

Winchester College New Sports Centre

  • Approximate GRC Area: 50m2
  • Project timescales: 2022
  • Location: Winchester

BCM GRC supplied ground-floor and main-entrance cladding to Winchester College’s new Sports Centre facility, including panels that featured the college’s name and crest, with signage supported through the GRC.

GRC Cable Trough System

  • Approximate GRC Area: 1000 Lineal metres
  • Location: Cambridge, Cambridgeshire

Delivered in support of Network Rail’s Cambridge re-signalling programme – C/01/09 GRC Cable Trough System was selected for its robust cable containment capabilities and ease of installation.

GRC Cable Trough System

  • Approximate GRC Area: 600 Lineal metres
  • Location: Fenham Low Moor, Northumberland

Installed adjacent to Fenham Low Moor Level Crossing – C/01/09 GRC Cable Trough System was chosen for its ability to withstand frequent train movements and environmental stressors typical of the coastal terrain.

GRC Cable Trough System

  • Approximate GRC Area: 500 Lineal metres
  • Location: Muir of Ord, Highland

Supplied for essential rail infrastructure works at Muir of Ord, Highland – C/01/07 GRC Cable Trough System was selected for its durability and ease of installation, providing secure cable management in challenging rural conditions.

GRC Cable Trough System

  • Approximate GRC Area: 475 Lineal metres
  • Location: Ardwick, Manchester

Delivered to support infrastructure upgrades at Ardwick, Manchester – C/01/08 GRC Cable Trough System was chosen for its reliable cable protection and straightforward installation, ensuring efficient project delivery in a busy rail environment.

GRC Ballast Boards

  • Location: Lewes, East Sussex

Delivered to support infrastructure upgrades in the Lewes area, where Network Rail has recently undertaken significant engineering works including full resignalling and track renewal across the Lewes–Seaford corridor. The GRC Ballast Boards (1830 x 300 x 50mm) were selected for their durability and suitability for large-scale rail projects.

GRC Ballast Boards

  • Location: Walsall, West Midlands

Delivered to protect lineside equipment near Walsall Station – GRC Ballast Boards (915 x 300 x 50mm) and Posts were selected for their durability and ease of installation in an urban rail environment.

GRC Ballast Boards

  • Location: County Monaghan

Supplied for rail infrastructure works in County Monaghan – GRC Ballast Boards (1830 x 300 x 50mm) were chosen for their strength and reliability, providing effective trackside support in a rural setting.